SRI KRISHNA COLLEGE OF ENGINEERING AND TECHNOLOGY

Web Opac

PROJECT MANAGEMENT WITH CPM, PERT AND PRECEDENCE DIAGRAMMING

By: Material type: TextTextLanguage: ENGLISH Publication details: CBS PUBLISHERS AND DISTRIBUTORS; 1986Edition: 3Description: xiv,389 pISBN:
Subject(s): DDC classification:
  • 658.404 MOD (MBA)
  • JOS
Tags from this library: No tags from this library for this title. Log in to add tags.
Star ratings
    Average rating: 0.0 (0 votes)
Holdings
Item type Current library Call number Materials specified Status Notes Date due Barcode
Book Sri Krishna College of Engineering and Technology CL-MBA / RACK 2 SHELF 4 658.404 MOD (MBA) (Browse shelf(Opens below)) PAPER PACK Available MBA 78215
Book Sri Krishna College of Engineering and Technology CL-MBA / RACK 2 SHELF 4 658.404 MOD (MBA) (Browse shelf(Opens below)) PAPER PACK Available MBA 78216
Book Sri Krishna College of Engineering and Technology CL-MBA / RACK 2 SHELF 4 658.404 MOD (MBA) (Browse shelf(Opens below)) PAPER PACK Available MBA 78217
Book Sri Krishna College of Engineering and Technology CL-MBA / RACK 2 SHELF 4 658.404 MOD (MBA) (Browse shelf(Opens below)) PAPER PACK Available MBA 78218
Book Sri Krishna College of Engineering and Technology CL-MBA / RACK 2 SHELF 4 658.404 MOD (MBA) (Browse shelf(Opens below)) PAPER PACK Available MBA 78219

There are no comments on this title.

to post a comment.
2CQR AUTOMATION PVT. LTD.
Phone no. 91-99620 02002, 91-93620 02002, info@2cqr.in



Powered by Koha